{"product_id":"wingoin-heavy-duty-dog-leash-for-large-medium-small-dogs-reflective-tactical-dog-training-leash-with-double-handles-poop-bag-holder-safety-buckle-6ft-long-lead-for-dogs-walking-running-pink","title":"WINGOIN Heavy Duty Dog Leash for Large Medium Small Dogs, Reflective Tactical Dog Training Leash with Double Handles, Poop Bag Holder, Safety Buckle, 6FT Long Lead for Dogs Walking, Running, Pink","description":"\u003ch3\u003eWINGOIN Heavy Duty Dog Leash for Large Medium Small Dogs, Reflective Tactical Dog Training Leash with Double Handles, Poop Bag Holder, Safety Buckle, 6FT Long Lead for Dogs Walking, Running, Pink\u003c\/h3\u003e\r\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \r\n\r\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\r\n  \u003cul class=\"a\"\u003e\r\n         \u003cli\u003eDouble handles: The heavy duty dog leash is equipped with 2 thickened padded handles, which are comfortable to hold and do not tire your hands. The long handle is suitable for daily dog walking, and the short handle is convenient for you to train your dog and quickly control in emergencies.\u003c\/li\u003e\r\n         \u003cli\u003eMetal Buckle: The no pull dog leash uses double-layer high-strength nylon webbing and a sturdy metal buckle, which is durable and can be quickly connected to your dog's harness or collar without worrying about accidental breakage. The buckle's 360 rotation design prevents tangling and is ideal for close-range public walks and hikes.\u003c\/li\u003e\r\n         \u003cli\u003ePoop Bag Holder: The 6 ft long dog leash comes with a poop bag holder attached to a D-ring. This convenient holder can store poop bags, dog treats, keys, coins, and more, making it easy to handle unexpected situations on your walks.\u003c\/li\u003e\r\n         \u003cli\u003eReflective Strips: This service dog leash features dual reflective strips on both sides, enhancing visibility and safety. During nighttime walks, it allows you and your pet to be easily spotted, to protect you and your dog's safety\u003c\/li\u003e\r\n         \u003cli\u003eCar Safety Buckle: This nylon dog leash comes with a car seat belt buckle that securely fastens your dog in place while in the vehicle. It prevents your dog from moving freely, reduces distractions to the driver, and ensures a more comfortable and safer journey.\u003c\/li\u003e\r\n  \u003c\/ul\u003e","brand":"WINGOIN","offers":[{"title":"Default Title","offer_id":44791868227784,"sku":"B0DT9KQ25G","price":151.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0269\/1376\/7486\/files\/B0DT9KQ25G.jpg?v=1775803659","url":"https:\/\/pawsplanetshop.com\/products\/wingoin-heavy-duty-dog-leash-for-large-medium-small-dogs-reflective-tactical-dog-training-leash-with-double-handles-poop-bag-holder-safety-buckle-6ft-long-lead-for-dogs-walking-running-pink","provider":"PawsPlanet Australia","version":"1.0","type":"link"}