HUNTER Nylon Adjustable Extra Long Lead, 15/300 cm, Brown
HUNTER Nylon Adjustable Extra Long Lead, 15/300 cm, Brown
Colour Name:Brown | Size Name:15/300 cm Extra long nylon training lead with trigger hook. Directions As description P.when('A').execute(function(A) { A.on('a:expander:toggle_description:toggle:collapse', function(data) { window.scroll(0, data.expander.$expander[0].offsetTop-100); }); }); Box Contains Adjustable Lead Extra Long 15/300 Nylon brown See more
Product Features
- An everyday lead.
- Soft thick nylon
- 3 fold adjusatble.
Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).
This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.
You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.
Related Products
Arppe 195752512167 Nylon Fresh S...

Arppe 195752512167 Nylon Fresh Strap
$198.00 AUD
Arppe 195752512167 Nylon Fresh Strap Nylon strap fresh nylon strap with very soft feel, washable. Chrome Plated Zamak Carabiner Length 120 cm, width 2.3 cm. Colour: Green & Fuchsia Product Features High quality material; soft, skin-friendly and lightweight. Weather resistant - can be washed Ideal leash for wal...
Flexi - M new classic belt...

Flexi - M new classic belt strip 5 m Black Medium, 25 kg
$204.00 AUD
Flexi - M new classic belt strip 5 m Colour Name:Black | Size Name:Medium, 25 kg Flexi - M new classic belt strip 5 mNew Classic combines modern features and accessories with traditional advantages of a Flexi.Roller belt cord that allows us to walk with our dog keeping the distance we want.Manufactured in Germany with high quality materials, it...
Hunter Freestyle Retriever Leash...

Hunter Freestyle Retriever Leash, 10 mm Diameter x 170 cm Length, Black 1 x 170 cm
$185.00 AUD
Hunter Freestyle Retriever Leash, 10 mm Diameter x 170 cm Length, Black Product Features Lead has a stop ring to 1. act as non choking. 2. can be used as a figure of 8 to aid pulling. Stop ring individually adjustable with slide. Good thick, stong rope. Leather stitiched. 10mm thick, 170cm long
IBLUELOVER 3 in 1 Dog Leash...

IBLUELOVER 3 in 1 Dog Leash Detachable 3 Way Dog Lead with Padded Handle, No Tangle Triple Dog Splitter Lead Coupler Sturdy Nylon Dog Training Leash for Walking 1 2 3 Dogs
$184.00 AUD
IBLUELOVER 3 in 1 Dog Leash Detachable 3 Way Dog Lead with Padded Handle, No Tangle Triple Dog Splitter Lead Coupler Sturdy Nylon Dog Training Leash for Walking 1 2 3 Dogs Product Features: - Made from the premium quality nylon webbing stitching, enforced closed jointing O-ring. - Sturdy nylon strap with cotton sewn inside, it protects your hand...
SKYMEE 5FT Bungee Dog Leash for...

SKYMEE 5FT Bungee Dog Leash for Small Medium Dogs, Multifunction Shock Absorbing Reflective Leash with Car Seat Bucket, Double Padded Traffic Handle Extra Control for Dog Walking Running Training Grey
$163.00 AUD
SKYMEE 5FT Bungee Dog Leash for Small Medium Dogs, Multifunction Shock Absorbing Reflective Leash with Car Seat Bucket, Double Padded Traffic Handle Extra Control for Dog Walking Running Training Free Control for Up to 150lbs Dogs A very popular material, nylon provides durability at a cost that is friendlier than leather, with an extended life ...
Joytale Padded Handle Dog Lead, ...

Joytale Padded Handle Dog Lead, Reflective Nylon Dogs Leads for Training,Walking Leash for Small, Medium Dogs, 1.8m × 2cm,Black 1.8m x 2cm Black
$170.00 AUD
Joytale Padded Handle Dog Lead, Reflective Nylon Dogs Leads for Training,Walking Leash for Small, Medium Dogs, 1.8m × 2cm,Black This nylon leash use the matching training collar work perfect for your needs. Just type in "Joytale" into the Amazon search and you'll see all the pairing of leashes and collars or purchase them individually. Read more...
Koch G4251518 Nylon Lead with Pa...

Koch G4251518 Nylon Lead with Padded Wrist Strap, S, Copper
$171.00 AUD
Koch G4251518 Nylon Lead with Padded Wrist Strap, S, Copper Product Features Material: padded nylon hose Tested for harmful substances according to Oeko-Tex Standard 100 Soft and cuddly Easy-care Made in Germany
Halti Double Ended Lead, Small, ...

Halti Double Ended Lead, Small, Blue, 0.08 kg
$182.00 AUD
Halti Double Ended Lead, Small, Blue, 0.08 kg Product Features DOUBLE CLIP DOG LEAD: The ever popular Halti Double Ended dog lead offers 7 versatile functions, including hands free dog walking or running, easy walking of two dogs and quick tethering. STYLISH COMFORT: This Halti dog lead has full neoprene padding that prov...
AVANZONA Double Dog leads leash ...

AVANZONA Double Dog leads leash Nylon, Hand made in EU, NO PULL for walking 2 Dogs simultaneously, Training for small medium and large dogs. 55cm (Black&Red) Black&Red
$184.00 AUD
AVANZONA Double Dog leads leash Nylon, Hand made in EU, NO PULL for walking 2 Dogs simultaneously, Training for small medium and large dogs. 55cm (Black&Red) Colour Name:Black&Red ABOUT AVANZONA The ambassador of AVANZONA is the Boston Terrier named Goku, you can see his lovely image in the product album. Being derived from the love for ...
Anbeer 6 FT Dog Leash Traffic...

Anbeer 6 FT Dog Leash Traffic Padded Two Handles, Reflective Threads for Control Safety Training for Medium to Large Dogs-Black Black
$192.00 AUD
Anbeer 6 FT Dog Leash Traffic Padded Two Handles, Reflective Threads for Control Safety Training for Medium to Large Dogs-Black Multiple Colors Available: Available in 8 distinct colors to pick from, you can choose the color of the dog leash according to your pet’s collar or harness, take your dog and enjoy the joy of life, can also be given as ...