Enter LOVE5 at Checkout for 5% OFF & Free Shipping Australia Wide

{"id":7036426518728,"title":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red","handle":"long-line-dog-lead-ansontop-long-line-dog-lead-20m-long-leads-for-dog-training-long-dog-training-lead-long-dog-rope-lead-dog-lead-extra-long-retractable-20m-65ft-black-red-10m-red","description":"\u003ch3\u003eLong Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eColour Name:Red | Size Name:10m\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eLeash Size:20M\/66FT\u003c\/li\u003e\n \u003cli\u003eRobust MaterialDog lead is made of durable nylon with a carabiner made of high quality metal. Double-stitched design is strengthened, durable and hard-wearing.\u003c\/li\u003e\n \u003cli\u003eLong Training Dog Leash with Soft Padded HandleSoft comfort Neoprene padded handle. Be comfortable to hold it. Do not hurt your hands.\u003c\/li\u003e\n \u003cli\u003eSafety lock catch snap leadUnique designed the heavy duty clip hook pet leash with a safety lock catch to ensure the clip attached to your puppy's collar without coming off. Perfect for daily use, walking, jogging, running, camping and hiking, or out for a leisurely stroll backyard activities.\u003c\/li\u003e\n \u003cli\u003e10 Meter\/ 15 Meter\/ 20 Meter. Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2021-09-05T23:00:57+10:00","created_at":"2021-09-05T23:00:57+10:00","vendor":"Ansontop","type":"Training Leads","tags":["uk02"],"price":17600,"price_min":17600,"price_max":17600,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":40879620522184,"title":"Red \/ 10m","option1":"Red","option2":"10m","option3":null,"sku":"uk-B08ZMK9TYQ","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - Red \/ 10m","public_title":"Red \/ 10m","options":["Red","10m"],"price":17600,"weight":0,"compare_at_price":null,"inventory_management":null,"barcode":"8414802316733","requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B08ZMK9TYQ.jpg?v=1651080428","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71v0TPfBb5S.jpg?v=1630910677","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71CRZ-xdiML_ea3882f0-2d60-4d7a-bacf-c25e9e170b6d.jpg?v=1630910677","\/\/pawsplanetshop.com\/cdn\/shop\/products\/81zpBpv57GL.jpg?v=1630910677","\/\/pawsplanetshop.com\/cdn\/shop\/products\/81IszWl1XuL_44af965d-fa78-4fe1-974c-0331a25a8b2e.jpg?v=1630910677","\/\/pawsplanetshop.com\/cdn\/shop\/products\/813qB0Wjz1L_56910827-656c-4112-a8dd-84b92b4d2675.jpg?v=1630910677","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71y1E1UDckL.jpg?v=1630910677"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B08ZMK9TYQ.jpg?v=1651080428","options":["Colour Name","Size Name"],"media":[{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":24905318072520,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B08ZMK9TYQ.jpg?v=1651080428"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B08ZMK9TYQ.jpg?v=1651080428","width":1600},{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":23204144414920,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71v0TPfBb5S.jpg?v=1630910677"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71v0TPfBb5S.jpg?v=1630910677","width":1600},{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":23204144447688,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71CRZ-xdiML_ea3882f0-2d60-4d7a-bacf-c25e9e170b6d.jpg?v=1630910677"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71CRZ-xdiML_ea3882f0-2d60-4d7a-bacf-c25e9e170b6d.jpg?v=1630910677","width":1600},{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":23204144480456,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81zpBpv57GL.jpg?v=1630910677"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81zpBpv57GL.jpg?v=1630910677","width":1600},{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":23204144513224,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81IszWl1XuL_44af965d-fa78-4fe1-974c-0331a25a8b2e.jpg?v=1630910677"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81IszWl1XuL_44af965d-fa78-4fe1-974c-0331a25a8b2e.jpg?v=1630910677","width":1600},{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":23204144545992,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/813qB0Wjz1L_56910827-656c-4112-a8dd-84b92b4d2675.jpg?v=1630910677"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/813qB0Wjz1L_56910827-656c-4112-a8dd-84b92b4d2675.jpg?v=1630910677","width":1600},{"alt":"Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m) Red - PawsPlanet Australia","id":23204144578760,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71y1E1UDckL.jpg?v=1630910677"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71y1E1UDckL.jpg?v=1630910677","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eLong Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m\/65ft Black ) (Red, 10m)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eColour Name:Red | Size Name:10m\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eLeash Size:20M\/66FT\u003c\/li\u003e\n \u003cli\u003eRobust MaterialDog lead is made of durable nylon with a carabiner made of high quality metal. Double-stitched design is strengthened, durable and hard-wearing.\u003c\/li\u003e\n \u003cli\u003eLong Training Dog Leash with Soft Padded HandleSoft comfort Neoprene padded handle. Be comfortable to hold it. Do not hurt your hands.\u003c\/li\u003e\n \u003cli\u003eSafety lock catch snap leadUnique designed the heavy duty clip hook pet leash with a safety lock catch to ensure the clip attached to your puppy's collar without coming off. Perfect for daily use, walking, jogging, running, camping and hiking, or out for a leisurely stroll backyard activities.\u003c\/li\u003e\n \u003cli\u003e10 Meter\/ 15 Meter\/ 20 Meter. Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.\u003c\/li\u003e\n \u003c\/ul\u003e"}

Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m/65ft Black ) (Red, 10m) Red

In Stock. Leaves warehouse within 2 - 3 business days

$176.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Long Line Dog Lead, Ansontop Long Line Dog Lead 20m, Long Leads For Dog Training, Long Dog Training Lead, Long Dog Rope Lead, Dog Lead Extra Long Retractable( 20m/65ft Black ) (Red, 10m)

Colour Name:Red | Size Name:10m

Product Features

  • Leash Size:20M/66FT
  • Robust MaterialDog lead is made of durable nylon with a carabiner made of high quality metal. Double-stitched design is strengthened, durable and hard-wearing.
  • Long Training Dog Leash with Soft Padded HandleSoft comfort Neoprene padded handle. Be comfortable to hold it. Do not hurt your hands.
  • Safety lock catch snap leadUnique designed the heavy duty clip hook pet leash with a safety lock catch to ensure the clip attached to your puppy's collar without coming off. Perfect for daily use, walking, jogging, running, camping and hiking, or out for a leisurely stroll backyard activities.
  • 10 Meter/ 15 Meter/ 20 Meter. Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.

Related Products