Enter LOVE5 at Checkout for 5% OFF & Free Shipping Australia Wide

{"id":8008721400008,"title":"BTINESFUL 12ft\/20ft\/32ft Long Dog Leash for 2 Dogs, No Tangle 1\/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training Main rope: 12ft x 1\/3\" Orange","handle":"btinesful-12ft-20ft-32ft-long-dog-leash-for-2-dogs-no-tangle-1-3inch-reflective-dual-dog-leash-long-lead-for-medium-small-dogs-outside-long-walking-leash-for-two-dogs-playing-recall-training-main-rope-12ft-x-1-3-orange","description":"\u003ch3\u003eBTINESFUL 12ft\/20ft\/32ft Long Dog Leash for 2 Dogs, No Tangle 1\/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eLong leash for 2 dogs This is your first long leash for 2 dogs, both dogs can go in opposite directions without it all getting tangled. Your two dogs will be so happy when out side on it.\u003c\/li\u003e\n \u003cli\u003eNo Tangle Dual Long Leash This long double dog leash is equipped with 12ft long main rope with soft padded handle and a 3ft sling leash. 360 degree rotation buckle connect them to allow move freely and both dogs can so where they want. No more dragging.\u003c\/li\u003e\n \u003cli\u003eMaterials We used lightweight yet strong and flexible diameter 1\/3inch (about 8mm) nylon rope. Reflective stitching to keep dogs safe. Two durable black clasps, can totally control a strong puppy, small, medium dogs. Soft handle to give you a premium dog walking experience.\u003c\/li\u003e\n \u003cli\u003eApplication - Perfect for Outdoor Activities with 2 dogs together. It offers the perfect balance between control, comfort and safety, so you can let your two dogs enjoy your adventures together. Walking, recall training, outdoor playing.\u003c\/li\u003e\n \u003cli\u003eAvailable in black, orange, blue three colors and 12ft, 20ft and 32ft three lengths. Safe, durable, and lightweight. Great for two dogs walking playing training without tangling.\u003c\/li\u003e\n \u003cli\u003eWarmly Remind - This is durable nylon rope rather than metal or cable leash, so please don't use it to test the chewing ability of your dog's teeth. Thank you!\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2024-07-16T01:29:21+10:00","created_at":"2024-07-16T01:29:21+10:00","vendor":"BTINESFUL","type":"Double Leashes","tags":["pets_July2024_update"],"price":12100,"price_min":12100,"price_max":12100,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":43944421359816,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0C4YHLSJY","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"BTINESFUL 12ft\/20ft\/32ft Long Dog Leash for 2 Dogs, No Tangle 1\/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training Main rope: 12ft x 1\/3\" Orange","public_title":null,"options":["Default Title"],"price":12100,"weight":150,"compare_at_price":null,"inventory_management":"shopify","barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/files\/61yB_MDdbOL.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/51GzQEGm67L.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/61Hux-09waL.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/61ABnc3lWPL.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/51nJeV0yXpL.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/81NKRQcEVZL.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/61k7KFNrE9L.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71SX63Bcq0L.jpg?v=1721057374","\/\/pawsplanetshop.com\/cdn\/shop\/files\/81HDGF1d1TL.jpg?v=1721057374"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61yB_MDdbOL.jpg?v=1721057374","options":["Title"],"media":[{"alt":null,"id":28347028635848,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61yB_MDdbOL.jpg?v=1721057374"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61yB_MDdbOL.jpg?v=1721057374","width":1001},{"alt":null,"id":28347028668616,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/51GzQEGm67L.jpg?v=1721057374"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/51GzQEGm67L.jpg?v=1721057374","width":1001},{"alt":null,"id":28347028701384,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61Hux-09waL.jpg?v=1721057374"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61Hux-09waL.jpg?v=1721057374","width":1001},{"alt":null,"id":28347028734152,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61ABnc3lWPL.jpg?v=1721057374"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61ABnc3lWPL.jpg?v=1721057374","width":1001},{"alt":null,"id":28347028766920,"position":5,"preview_image":{"aspect_ratio":1.199,"height":1001,"width":1200,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/51nJeV0yXpL.jpg?v=1721057374"},"aspect_ratio":1.199,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/51nJeV0yXpL.jpg?v=1721057374","width":1200},{"alt":null,"id":28347028799688,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81NKRQcEVZL.jpg?v=1721057374"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81NKRQcEVZL.jpg?v=1721057374","width":1001},{"alt":null,"id":28347028832456,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61k7KFNrE9L.jpg?v=1721057374"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/61k7KFNrE9L.jpg?v=1721057374","width":1001},{"alt":null,"id":28347028865224,"position":8,"preview_image":{"aspect_ratio":1.0,"height":800,"width":800,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71SX63Bcq0L.jpg?v=1721057374"},"aspect_ratio":1.0,"height":800,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71SX63Bcq0L.jpg?v=1721057374","width":800},{"alt":null,"id":28347028897992,"position":9,"preview_image":{"aspect_ratio":0.834,"height":1200,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81HDGF1d1TL.jpg?v=1721057374"},"aspect_ratio":0.834,"height":1200,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81HDGF1d1TL.jpg?v=1721057374","width":1001}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eBTINESFUL 12ft\/20ft\/32ft Long Dog Leash for 2 Dogs, No Tangle 1\/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eLong leash for 2 dogs This is your first long leash for 2 dogs, both dogs can go in opposite directions without it all getting tangled. Your two dogs will be so happy when out side on it.\u003c\/li\u003e\n \u003cli\u003eNo Tangle Dual Long Leash This long double dog leash is equipped with 12ft long main rope with soft padded handle and a 3ft sling leash. 360 degree rotation buckle connect them to allow move freely and both dogs can so where they want. No more dragging.\u003c\/li\u003e\n \u003cli\u003eMaterials We used lightweight yet strong and flexible diameter 1\/3inch (about 8mm) nylon rope. Reflective stitching to keep dogs safe. Two durable black clasps, can totally control a strong puppy, small, medium dogs. Soft handle to give you a premium dog walking experience.\u003c\/li\u003e\n \u003cli\u003eApplication - Perfect for Outdoor Activities with 2 dogs together. It offers the perfect balance between control, comfort and safety, so you can let your two dogs enjoy your adventures together. Walking, recall training, outdoor playing.\u003c\/li\u003e\n \u003cli\u003eAvailable in black, orange, blue three colors and 12ft, 20ft and 32ft three lengths. Safe, durable, and lightweight. Great for two dogs walking playing training without tangling.\u003c\/li\u003e\n \u003cli\u003eWarmly Remind - This is durable nylon rope rather than metal or cable leash, so please don't use it to test the chewing ability of your dog's teeth. Thank you!\u003c\/li\u003e\n \u003c\/ul\u003e"}

BTINESFUL 12ft/20ft/32ft Long Dog Leash for 2 Dogs, No Tangle 1/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training Main rope: 12ft x 1/3" Orange

In Stock. Leaves warehouse within 2 - 3 business days

$121.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

BTINESFUL 12ft/20ft/32ft Long Dog Leash for 2 Dogs, No Tangle 1/3inch Reflective Dual Dog Leash Long Lead for Medium Small Dogs, Outside Long Walking Leash for Two Dogs Playing Recall Training

Product Features

  • Long leash for 2 dogs This is your first long leash for 2 dogs, both dogs can go in opposite directions without it all getting tangled. Your two dogs will be so happy when out side on it.
  • No Tangle Dual Long Leash This long double dog leash is equipped with 12ft long main rope with soft padded handle and a 3ft sling leash. 360 degree rotation buckle connect them to allow move freely and both dogs can so where they want. No more dragging.
  • Materials We used lightweight yet strong and flexible diameter 1/3inch (about 8mm) nylon rope. Reflective stitching to keep dogs safe. Two durable black clasps, can totally control a strong puppy, small, medium dogs. Soft handle to give you a premium dog walking experience.
  • Application - Perfect for Outdoor Activities with 2 dogs together. It offers the perfect balance between control, comfort and safety, so you can let your two dogs enjoy your adventures together. Walking, recall training, outdoor playing.
  • Available in black, orange, blue three colors and 12ft, 20ft and 32ft three lengths. Safe, durable, and lightweight. Great for two dogs walking playing training without tangling.
  • Warmly Remind - This is durable nylon rope rather than metal or cable leash, so please don't use it to test the chewing ability of your dog's teeth. Thank you!

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.