Enter LOVE5 at Checkout for 5% OFF & Free Shipping Australia Wide

{"id":4551338655806,"title":"Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black","handle":"cuteboom-extra-long-line-training-dog-leash-26ft-40ft-50ft-65ft-large-and-durable-dog-outdoor-long-lead-perfect-for-training-play-camping-65-black","description":"\u003ch3\u003eCuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eSize:65 | Color:Black Basic information Product Name: Dog Long Leash Color:\nBlack \/ Blue Leash Width: 1 Inch Length: 26ft 40ft 50ft 65ft Fit for: Small to\nLarge Dog A long dog training leash. People can go out with dog. And dog can\nenjoy freedom and you could always control your dog. It is a perfect product\nfor dog and people to take a wonderful outdoor time.\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eThis is a well made long leash. The line is durable enough for small to large dog.\u003c\/li\u003e\n \u003cli\u003eThe main material of this rope is nylon, which can effectively prevent dog bites.\u003c\/li\u003e\n \u003cli\u003eBlue and black available. Available in four lengths.(26ft 40ft 50ft 65ft). You could choice one you or your pet like. Handle is made from advanced diving material, more comfortable and wearable.\u003c\/li\u003e\n \u003cli\u003eHandle is made from advanced diving material, more comfortable and wearable.\u003c\/li\u003e\n \u003cli\u003eIt's a long enough leash for hiking, camping, training, hunting, backyard. The pet would enjoy running free and you wouldn't worry about lose the control.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2020-05-28T09:46:09+10:00","created_at":"2020-05-28T09:46:09+10:00","vendor":"Cuteboom","type":"Training Leashes","tags":["cp505"],"price":15800,"price_min":15800,"price_max":15800,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":31992891179070,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B07Q5DSJ3J","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black","public_title":null,"options":["Default Title"],"price":15800,"weight":522,"compare_at_price":null,"inventory_management":null,"barcode":"0717877046078","requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/products\/B07Q5DSJ3J.jpg?v=1650699980","\/\/pawsplanetshop.com\/cdn\/shop\/products\/51TCmYqFu6L.jpg?v=1622487686","\/\/pawsplanetshop.com\/cdn\/shop\/products\/41YlwNIYIuL.jpg?v=1622487686","\/\/pawsplanetshop.com\/cdn\/shop\/products\/51rjWg3ySRL.jpg?v=1622487686","\/\/pawsplanetshop.com\/cdn\/shop\/products\/51D0-0fmUYL.jpg?v=1622487686"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/B07Q5DSJ3J.jpg?v=1650699980","options":["Title"],"media":[{"alt":"[Australia] - Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black ","id":24878805549256,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1001,"width":1001,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/B07Q5DSJ3J.jpg?v=1650699980"},"aspect_ratio":1.0,"height":1001,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/B07Q5DSJ3J.jpg?v=1650699980","width":1001},{"alt":"[Australia] - Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black ","id":7214535082046,"position":2,"preview_image":{"aspect_ratio":1.0,"height":500,"width":500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/51TCmYqFu6L.jpg?v=1622487686"},"aspect_ratio":1.0,"height":500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/51TCmYqFu6L.jpg?v=1622487686","width":500},{"alt":"[Australia] - Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black ","id":7214535114814,"position":3,"preview_image":{"aspect_ratio":1.0,"height":500,"width":500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/41YlwNIYIuL.jpg?v=1622487686"},"aspect_ratio":1.0,"height":500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/41YlwNIYIuL.jpg?v=1622487686","width":500},{"alt":"[Australia] - Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black ","id":7214535147582,"position":4,"preview_image":{"aspect_ratio":1.0,"height":500,"width":500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/51rjWg3ySRL.jpg?v=1622487686"},"aspect_ratio":1.0,"height":500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/51rjWg3ySRL.jpg?v=1622487686","width":500},{"alt":"[Australia] - Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black ","id":7214535180350,"position":5,"preview_image":{"aspect_ratio":1.0,"height":500,"width":500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/51D0-0fmUYL.jpg?v=1622487686"},"aspect_ratio":1.0,"height":500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/51D0-0fmUYL.jpg?v=1622487686","width":500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eCuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eSize:65 | Color:Black Basic information Product Name: Dog Long Leash Color:\nBlack \/ Blue Leash Width: 1 Inch Length: 26ft 40ft 50ft 65ft Fit for: Small to\nLarge Dog A long dog training leash. People can go out with dog. And dog can\nenjoy freedom and you could always control your dog. It is a perfect product\nfor dog and people to take a wonderful outdoor time.\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eThis is a well made long leash. The line is durable enough for small to large dog.\u003c\/li\u003e\n \u003cli\u003eThe main material of this rope is nylon, which can effectively prevent dog bites.\u003c\/li\u003e\n \u003cli\u003eBlue and black available. Available in four lengths.(26ft 40ft 50ft 65ft). You could choice one you or your pet like. Handle is made from advanced diving material, more comfortable and wearable.\u003c\/li\u003e\n \u003cli\u003eHandle is made from advanced diving material, more comfortable and wearable.\u003c\/li\u003e\n \u003cli\u003eIt's a long enough leash for hiking, camping, training, hunting, backyard. The pet would enjoy running free and you wouldn't worry about lose the control.\u003c\/li\u003e\n \u003c\/ul\u003e"}

Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping 65 Black

In Stock. Leaves warehouse within 2 - 3 business days

$158.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Cuteboom Extra Long Line Training Dog Leash 26ft 40ft 50ft 65ft Large and Durable Dog Outdoor Long Lead-Perfect for Training, Play, Camping

Size:65 | Color:Black Basic information Product Name: Dog Long Leash Color: Black / Blue Leash Width: 1 Inch Length: 26ft 40ft 50ft 65ft Fit for: Small to Large Dog A long dog training leash. People can go out with dog. And dog can enjoy freedom and you could always control your dog. It is a perfect product for dog and people to take a wonderful outdoor time.

Product Features

  • This is a well made long leash. The line is durable enough for small to large dog.
  • The main material of this rope is nylon, which can effectively prevent dog bites.
  • Blue and black available. Available in four lengths.(26ft 40ft 50ft 65ft). You could choice one you or your pet like. Handle is made from advanced diving material, more comfortable and wearable.
  • Handle is made from advanced diving material, more comfortable and wearable.
  • It's a long enough leash for hiking, camping, training, hunting, backyard. The pet would enjoy running free and you wouldn't worry about lose the control.

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.

Related Products