Enter LOVE5 at Checkout for 5% OFF & Free Shipping Australia Wide

{"id":7296313458888,"title":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle","handle":"litspot-extra-long-line-training-dog-leash-for-large-50m-160ft-red-medium-and-small-dogs-long-lead-great-for-training-play-camping-or-backyard-9m-with-handle-black-9m-with-handle","description":"\u003ch3\u003eLITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eFeatures:Color: black\/redMaterial: durable soft nylon and metal hookSize:\nlength 4.5m\/15ft, 50m\/160ft. Width both: 2.5cm\/0.85ftUsually used for pet\ntraining!Perfect for training your pet dog, cat and puppy, and also suitable\nfor walking your dog.Simple and practical design, and easy to use.Give the dog\nmore freedom of movement space, you can sit and let the dog run\ncasually.Application: Suitable for many pets like Samoyed, Teddy, Husky,\nRottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden\nRetriever, German Shepherd, Tibetan Mastiff and other breeds.In addition,\nsuitable for horse,rabbit and other animals\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eMade of strong nylon and durable metal hook, will outlast cotton leashes, easy to wear and remove.\u003c\/li\u003e\n \u003cli\u003eThis training leash is great for teaching your dog recalls.Allows you to teach your dog recalls and other obedience skills.\u003c\/li\u003e\n \u003cli\u003eIt can be washed easily, the plastic-based material is difficult to stain.\u003c\/li\u003e\n \u003cli\u003eSuitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds.In addition, suitable for horse,rabbit and other animals\u003c\/li\u003e\n \u003cli\u003eGreat for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming\u003c\/li\u003e\n \u003c\/ul\u003e\n\n","published_at":"2022-03-31T15:55:50+11:00","created_at":"2022-03-31T15:55:57+11:00","vendor":"LITSPOT","type":"Training Leads","tags":["pets_uk_update042022"],"price":17200,"price_min":17200,"price_max":17200,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":41750891167944,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"uk-B091L2B8S5","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle","public_title":null,"options":["Default Title"],"price":17200,"weight":0,"compare_at_price":null,"inventory_management":null,"barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B091L2B8S5.jpg?v=1650534598","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71dQkNL6eXL_2c1e001a-7e4c-4f1a-9dd1-8d2e506f7164.jpg?v=1648702557","\/\/pawsplanetshop.com\/cdn\/shop\/products\/61BUmIl3oaL_6676f7a4-e7c4-47c6-99a5-a9592ea1d0d2.jpg?v=1648702557","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71Bcyp3jVNL.jpg?v=1648702557","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71ENApAae-L_fb0fa705-897d-4317-9983-3b7cda7a2fdb.jpg?v=1648702557","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71ykm2XcHlL_c3113ab0-5b3c-4051-807c-ead5781b22fe.jpg?v=1648702557"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B091L2B8S5.jpg?v=1650534598","options":["Title"],"media":[{"alt":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle - PawsPlanet Australia","id":24868304421064,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B091L2B8S5.jpg?v=1650534598"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B091L2B8S5.jpg?v=1650534598","width":1500},{"alt":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle - PawsPlanet Australia","id":24719274016968,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71dQkNL6eXL_2c1e001a-7e4c-4f1a-9dd1-8d2e506f7164.jpg?v=1648702557"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71dQkNL6eXL_2c1e001a-7e4c-4f1a-9dd1-8d2e506f7164.jpg?v=1648702557","width":1500},{"alt":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle - PawsPlanet Australia","id":24719274049736,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/61BUmIl3oaL_6676f7a4-e7c4-47c6-99a5-a9592ea1d0d2.jpg?v=1648702557"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/61BUmIl3oaL_6676f7a4-e7c4-47c6-99a5-a9592ea1d0d2.jpg?v=1648702557","width":1500},{"alt":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle - PawsPlanet Australia","id":24719274082504,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71Bcyp3jVNL.jpg?v=1648702557"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71Bcyp3jVNL.jpg?v=1648702557","width":1500},{"alt":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle - PawsPlanet Australia","id":24719274115272,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71ENApAae-L_fb0fa705-897d-4317-9983-3b7cda7a2fdb.jpg?v=1648702557"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71ENApAae-L_fb0fa705-897d-4317-9983-3b7cda7a2fdb.jpg?v=1648702557","width":1500},{"alt":"LITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle - PawsPlanet Australia","id":24719274148040,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1500,"width":1500,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71ykm2XcHlL_c3113ab0-5b3c-4051-807c-ead5781b22fe.jpg?v=1648702557"},"aspect_ratio":1.0,"height":1500,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71ykm2XcHlL_c3113ab0-5b3c-4051-807c-ead5781b22fe.jpg?v=1648702557","width":1500}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eLITSPOT Extra Long Line Training Dog Leash For Large,50m\/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003eFeatures:Color: black\/redMaterial: durable soft nylon and metal hookSize:\nlength 4.5m\/15ft, 50m\/160ft. Width both: 2.5cm\/0.85ftUsually used for pet\ntraining!Perfect for training your pet dog, cat and puppy, and also suitable\nfor walking your dog.Simple and practical design, and easy to use.Give the dog\nmore freedom of movement space, you can sit and let the dog run\ncasually.Application: Suitable for many pets like Samoyed, Teddy, Husky,\nRottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden\nRetriever, German Shepherd, Tibetan Mastiff and other breeds.In addition,\nsuitable for horse,rabbit and other animals\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eMade of strong nylon and durable metal hook, will outlast cotton leashes, easy to wear and remove.\u003c\/li\u003e\n \u003cli\u003eThis training leash is great for teaching your dog recalls.Allows you to teach your dog recalls and other obedience skills.\u003c\/li\u003e\n \u003cli\u003eIt can be washed easily, the plastic-based material is difficult to stain.\u003c\/li\u003e\n \u003cli\u003eSuitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds.In addition, suitable for horse,rabbit and other animals\u003c\/li\u003e\n \u003cli\u003eGreat for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming\u003c\/li\u003e\n \u003c\/ul\u003e\n\n"}

LITSPOT Extra Long Line Training Dog Leash For Large,50m/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black) 9M with handle

In Stock. Leaves warehouse within 2 - 3 business days

$172.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

LITSPOT Extra Long Line Training Dog Leash For Large,50m/160ft Red Medium and Small Dogs Long Lead Great for Training, Play Camping or Backyard (9M with handle, Black)

Features:Color: black/redMaterial: durable soft nylon and metal hookSize: length 4.5m/15ft, 50m/160ft. Width both: 2.5cm/0.85ftUsually used for pet training!Perfect for training your pet dog, cat and puppy, and also suitable for walking your dog.Simple and practical design, and easy to use.Give the dog more freedom of movement space, you can sit and let the dog run casually.Application: Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds.In addition, suitable for horse,rabbit and other animals

Product Features

  • Made of strong nylon and durable metal hook, will outlast cotton leashes, easy to wear and remove.
  • This training leash is great for teaching your dog recalls.Allows you to teach your dog recalls and other obedience skills.
  • It can be washed easily, the plastic-based material is difficult to stain.
  • Suitable for many pets like Samoyed, Teddy, Husky, Rottweiler, Alaska, Chihuahua, Schnauzer, Miniature Pinscher, Golden Retriever, German Shepherd, Tibetan Mastiff and other breeds.In addition, suitable for horse,rabbit and other animals
  • Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.