Shop now and enjoy free shipping all month long 🎉

{"id":8244029784264,"title":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey","handle":"double-dog-leash-no-tangle-splitter-for-two-dogs-coupler-with-adjustable-long-lead-rope-dual-control-handles-retractable-no-pull-bungee-walk-train-small-medium-large-2-pets-grey-grey","description":"\u003ch3\u003eDouble Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eAdjustable Buckle \u0026amp; Extensible Rope for Multi-Use Size of the Coupler: \u0026lt;2.1-3.1 ft \u0026gt; \/ \u0026lt;25.6-27.4 in\u0026gt; \/ \u0026lt;65-95 cm\u0026gt;. Each rope is equipped with an Adjustable Buckle, so you can freely adjust the length when training, walking, running, or hiking with your furry friends. The Retractable Shock-Absorbing leash effectively reduces strain on your arms and shoulders when your dog suddenly lunges or changes direction, ensuring a more comfortable experience for both the dog and the walker.\u003c\/li\u003e\n \u003cli\u003e360Swivel Clip for Tangle-Free The Splitter is equipped with a 360 Rotating Buckle, allowing for quick release and locking, preventing twisting or knotting. This ensures your dogs freedom of movement, giving them more space while aving you time from having to untangle the leash as they move from side to side.\u003c\/li\u003e\n \u003cli\u003eTraffic Control Handle \u0026amp; Reflective Strap for Safety The Handle near the dog's neck is ergonomically designed with soft, thickened sponge padding for a comfortable grip. The non-slip design ensures a firm hold, providing better control over your dog in any situation. Reflective Threads improve visibility, keeping you and your dog safe during nighttime walks.\u003c\/li\u003e\n \u003cli\u003eHeavy-Duty Clip \u0026amp; Durable Leash Material The Metal Hook is made from durable and rust-proof galvanized zinc alloy. The leash is crafted from high-strength Climbing-Grade Nylon, ensuring exceptional durability and resistance to chewing and tearing. Reinforced Stitching enhances longevity, making it ideal for daily walks, training, and outdoor adventures.\u003c\/li\u003e\n \u003cli\u003ePremium Quality \u0026amp; Timely Service At LEOSASA, we are committed to providing premium products that enhance the safety, comfort, and happiness of both you and your dog. If you have any questions, please reach out to us, and we will provide you with a satisfactory solution within 24 hours.\u003c\/li\u003e\n \u003c\/ul\u003e","published_at":"2025-10-10T15:27:28+11:00","created_at":"2025-10-09T16:57:57+11:00","vendor":"LEOSASA","type":"Double Leashes","tags":["pets_selected_Oct2025"],"price":14100,"price_min":14100,"price_max":14100,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":44780373344456,"title":"Grey","option1":"Grey","option2":null,"option3":null,"sku":"B0F1XYXZZF","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - Grey","public_title":"Grey","options":["Grey"],"price":14100,"weight":499,"compare_at_price":null,"inventory_management":"shopify","barcode":"1V2-Y-GREY","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0F1XYXZZF.jpg?v=1775793990","\/\/pawsplanetshop.com\/cdn\/shop\/files\/713cgArd4DL.jpg?v=1759989480","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71nYwRIhLBL.jpg?v=1759989479","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71HeZBUJXmL.jpg?v=1759989480","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71qB9YMFjhL.jpg?v=1759989479","\/\/pawsplanetshop.com\/cdn\/shop\/files\/81-VdXH2g8L.jpg?v=1759989480","\/\/pawsplanetshop.com\/cdn\/shop\/files\/81BjUGzd2FL.jpg?v=1759989480"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0F1XYXZZF.jpg?v=1775793990","options":["Color"],"media":[{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856390344,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0F1XYXZZF.jpg?v=1775793990"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0F1XYXZZF.jpg?v=1775793990","width":1600},{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856423112,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/713cgArd4DL.jpg?v=1759989480"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/713cgArd4DL.jpg?v=1759989480","width":1600},{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856455880,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71nYwRIhLBL.jpg?v=1759989479"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71nYwRIhLBL.jpg?v=1759989479","width":1600},{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856488648,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71HeZBUJXmL.jpg?v=1759989480"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71HeZBUJXmL.jpg?v=1759989480","width":1600},{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856521416,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71qB9YMFjhL.jpg?v=1759989479"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71qB9YMFjhL.jpg?v=1759989479","width":1600},{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856554184,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81-VdXH2g8L.jpg?v=1759989480"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81-VdXH2g8L.jpg?v=1759989480","width":1600},{"alt":"Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey - PawsPlanet Australia","id":30279856586952,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81BjUGzd2FL.jpg?v=1759989480"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/81BjUGzd2FL.jpg?v=1759989480","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eDouble Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eAdjustable Buckle \u0026amp; Extensible Rope for Multi-Use Size of the Coupler: \u0026lt;2.1-3.1 ft \u0026gt; \/ \u0026lt;25.6-27.4 in\u0026gt; \/ \u0026lt;65-95 cm\u0026gt;. Each rope is equipped with an Adjustable Buckle, so you can freely adjust the length when training, walking, running, or hiking with your furry friends. The Retractable Shock-Absorbing leash effectively reduces strain on your arms and shoulders when your dog suddenly lunges or changes direction, ensuring a more comfortable experience for both the dog and the walker.\u003c\/li\u003e\n \u003cli\u003e360Swivel Clip for Tangle-Free The Splitter is equipped with a 360 Rotating Buckle, allowing for quick release and locking, preventing twisting or knotting. This ensures your dogs freedom of movement, giving them more space while aving you time from having to untangle the leash as they move from side to side.\u003c\/li\u003e\n \u003cli\u003eTraffic Control Handle \u0026amp; Reflective Strap for Safety The Handle near the dog's neck is ergonomically designed with soft, thickened sponge padding for a comfortable grip. The non-slip design ensures a firm hold, providing better control over your dog in any situation. Reflective Threads improve visibility, keeping you and your dog safe during nighttime walks.\u003c\/li\u003e\n \u003cli\u003eHeavy-Duty Clip \u0026amp; Durable Leash Material The Metal Hook is made from durable and rust-proof galvanized zinc alloy. The leash is crafted from high-strength Climbing-Grade Nylon, ensuring exceptional durability and resistance to chewing and tearing. Reinforced Stitching enhances longevity, making it ideal for daily walks, training, and outdoor adventures.\u003c\/li\u003e\n \u003cli\u003ePremium Quality \u0026amp; Timely Service At LEOSASA, we are committed to providing premium products that enhance the safety, comfort, and happiness of both you and your dog. If you have any questions, please reach out to us, and we will provide you with a satisfactory solution within 24 hours.\u003c\/li\u003e\n \u003c\/ul\u003e"}

Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey) Grey

In Stock. Leaves warehouse within 2 - 3 business days

$141.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee, Walk Train Small Medium Large 2 Pets (Grey)

Product Features

  • Adjustable Buckle & Extensible Rope for Multi-Use Size of the Coupler: <2.1-3.1 ft > / <25.6-27.4 in> / <65-95 cm>. Each rope is equipped with an Adjustable Buckle, so you can freely adjust the length when training, walking, running, or hiking with your furry friends. The Retractable Shock-Absorbing leash effectively reduces strain on your arms and shoulders when your dog suddenly lunges or changes direction, ensuring a more comfortable experience for both the dog and the walker.
  • 360Swivel Clip for Tangle-Free The Splitter is equipped with a 360 Rotating Buckle, allowing for quick release and locking, preventing twisting or knotting. This ensures your dogs freedom of movement, giving them more space while aving you time from having to untangle the leash as they move from side to side.
  • Traffic Control Handle & Reflective Strap for Safety The Handle near the dog's neck is ergonomically designed with soft, thickened sponge padding for a comfortable grip. The non-slip design ensures a firm hold, providing better control over your dog in any situation. Reflective Threads improve visibility, keeping you and your dog safe during nighttime walks.
  • Heavy-Duty Clip & Durable Leash Material The Metal Hook is made from durable and rust-proof galvanized zinc alloy. The leash is crafted from high-strength Climbing-Grade Nylon, ensuring exceptional durability and resistance to chewing and tearing. Reinforced Stitching enhances longevity, making it ideal for daily walks, training, and outdoor adventures.
  • Premium Quality & Timely Service At LEOSASA, we are committed to providing premium products that enhance the safety, comfort, and happiness of both you and your dog. If you have any questions, please reach out to us, and we will provide you with a satisfactory solution within 24 hours.

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.