Enter LOVE5 at Checkout for 5% OFF & Free Shipping Australia Wide

{"id":7294778441928,"title":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft","handle":"eyeleaf-training-leads-for-dogs-nylon-long-training-dog-leash-long-dog-recall-lead-long-line-for-dog-tracking-training-long-lead-leash-for-pet-recall-obedience-comfortable-padded-handle-5m-16ft-5m-16ft","description":"\u003ch3\u003eEyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eDimension ApproxWidth:2.5cm; Available in six size, 50m\/165ft, 30m\/100ft, 20m\/65ft, 15m\/50ft, 10m\/30ft, 5m\/16ft; Our extra long lead has the length needed to allow them to wander and ensure your command to come.\u003c\/li\u003e\n \u003cli\u003eWell made Training LeashIts made of strong nylon with durable metal Buckle. This long dog training leash is durable and heavy duty, easy to wear and remove.\u003c\/li\u003e\n \u003cli\u003eComfortable DesignThe dog leash with a foam padded handle that is super comfortable while dogs pulling,and protects your hand.\u003c\/li\u003e\n \u003cli\u003eMulti-Functional UseOur dog training leash allows a dog to run free and teach your dog recalls and other obedience skills, yet remain under control if walking in a public place.Also great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.\u003c\/li\u003e\n \u003cli\u003e100% Service \u0026amp; Guarantee: We are happy to provide full satisfaction with our Dog leash. 30 days product replacement or refund if you are not satisfied. Contact us at first time if not satisfied.thank you so much.\u003c\/li\u003e\n \u003c\/ul\u003e\n\n","published_at":"2022-03-29T11:06:34+11:00","created_at":"2022-03-29T11:06:42+11:00","vendor":"Eyeleaf","type":"Training Leads","tags":["pets_uk_update042022"],"price":16000,"price_min":16000,"price_max":16000,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":41743418818760,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"uk-B09C7LDN8Z","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft","public_title":null,"options":["Default Title"],"price":16000,"weight":0,"compare_at_price":null,"inventory_management":null,"barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B09C7LDN8Z.jpg?v=1650523304","\/\/pawsplanetshop.com\/cdn\/shop\/products\/61VALd9vOkL.jpg?v=1648512402","\/\/pawsplanetshop.com\/cdn\/shop\/products\/61klzlkQ_LL.jpg?v=1648512402","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71xSSO-Fk_L.jpg?v=1648512402","\/\/pawsplanetshop.com\/cdn\/shop\/products\/81JmGI8S0XL.jpg?v=1648512402","\/\/pawsplanetshop.com\/cdn\/shop\/products\/71AhoXwz2lL.jpg?v=1648512402","\/\/pawsplanetshop.com\/cdn\/shop\/products\/81yS4OdMV7L.jpg?v=1648512402"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B09C7LDN8Z.jpg?v=1650523304","options":["Title"],"media":[{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24867327934664,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1200,"width":1200,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B09C7LDN8Z.jpg?v=1650523304"},"aspect_ratio":1.0,"height":1200,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/uk-B09C7LDN8Z.jpg?v=1650523304","width":1200},{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24705672773832,"position":2,"preview_image":{"aspect_ratio":1.092,"height":916,"width":1000,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/61VALd9vOkL.jpg?v=1648512402"},"aspect_ratio":1.092,"height":916,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/61VALd9vOkL.jpg?v=1648512402","width":1000},{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24705672806600,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1200,"width":1200,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/61klzlkQ_LL.jpg?v=1648512402"},"aspect_ratio":1.0,"height":1200,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/61klzlkQ_LL.jpg?v=1648512402","width":1200},{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24705672839368,"position":4,"preview_image":{"aspect_ratio":1.285,"height":778,"width":1000,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71xSSO-Fk_L.jpg?v=1648512402"},"aspect_ratio":1.285,"height":778,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71xSSO-Fk_L.jpg?v=1648512402","width":1000},{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24705672872136,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1200,"width":1200,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81JmGI8S0XL.jpg?v=1648512402"},"aspect_ratio":1.0,"height":1200,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81JmGI8S0XL.jpg?v=1648512402","width":1200},{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24705672904904,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1200,"width":1200,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71AhoXwz2lL.jpg?v=1648512402"},"aspect_ratio":1.0,"height":1200,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/71AhoXwz2lL.jpg?v=1648512402","width":1200},{"alt":"Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft) 5M\/16ft - PawsPlanet Australia","id":24705672937672,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1200,"width":1200,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81yS4OdMV7L.jpg?v=1648512402"},"aspect_ratio":1.0,"height":1200,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/products\/81yS4OdMV7L.jpg?v=1648512402","width":1200}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003eEyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M\/16ft)\u003c\/h3\u003e\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \n\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\n \u003cul class=\"a\"\u003e\n \u003cli\u003eDimension ApproxWidth:2.5cm; Available in six size, 50m\/165ft, 30m\/100ft, 20m\/65ft, 15m\/50ft, 10m\/30ft, 5m\/16ft; Our extra long lead has the length needed to allow them to wander and ensure your command to come.\u003c\/li\u003e\n \u003cli\u003eWell made Training LeashIts made of strong nylon with durable metal Buckle. This long dog training leash is durable and heavy duty, easy to wear and remove.\u003c\/li\u003e\n \u003cli\u003eComfortable DesignThe dog leash with a foam padded handle that is super comfortable while dogs pulling,and protects your hand.\u003c\/li\u003e\n \u003cli\u003eMulti-Functional UseOur dog training leash allows a dog to run free and teach your dog recalls and other obedience skills, yet remain under control if walking in a public place.Also great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.\u003c\/li\u003e\n \u003cli\u003e100% Service \u0026amp; Guarantee: We are happy to provide full satisfaction with our Dog leash. 30 days product replacement or refund if you are not satisfied. Contact us at first time if not satisfied.thank you so much.\u003c\/li\u003e\n \u003c\/ul\u003e\n\n"}

Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M/16ft) 5M/16ft

In Stock. Leaves warehouse within 2 - 3 business days

$160.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Eyeleaf Training Leads for Dogs - Nylon Long Training Dog Leash Long Dog Recall Lead, Long Line for Dog Tracking Training, Long Lead Leash for Pet Recall Obedience Comfortable Padded Handle (5M/16ft)

Product Features

  • Dimension ApproxWidth:2.5cm; Available in six size, 50m/165ft, 30m/100ft, 20m/65ft, 15m/50ft, 10m/30ft, 5m/16ft; Our extra long lead has the length needed to allow them to wander and ensure your command to come.
  • Well made Training LeashIts made of strong nylon with durable metal Buckle. This long dog training leash is durable and heavy duty, easy to wear and remove.
  • Comfortable DesignThe dog leash with a foam padded handle that is super comfortable while dogs pulling,and protects your hand.
  • Multi-Functional UseOur dog training leash allows a dog to run free and teach your dog recalls and other obedience skills, yet remain under control if walking in a public place.Also great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls and swimming.
  • 100% Service & Guarantee: We are happy to provide full satisfaction with our Dog leash. 30 days product replacement or refund if you are not satisfied. Contact us at first time if not satisfied.thank you so much.

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.