lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Orange 3/8 inch * 50foot
lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
Product Features
- SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8 is a suitable thickness for long training dog leash, it has both strength and portability
- NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
- LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and wont sink, it will float when submerged and highly visible against any background.
- SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
- SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 50foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).
This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.
You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.