Shop now and enjoy free shipping all month long 🎉

{"id":8246170484936,"title":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing)","handle":"pecute-slicker-brush-for-dogs-cats-with-air-cushion-and-soft-pins-dog-brush-for-shedding-massaging-grooming-lightweight-cat-brush-with-pet-comb-gently-removes-loose-fur-undercoat-s-curved-head-gentle-smoothing","description":"\u003ch3\u003ePecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat\u003c\/h3\u003e\r\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \r\n\r\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\r\n \u003cul class=\"a\"\u003e\r\n \u003cli\u003eEFFORTLESS SHEDDING CONTROL: This dog slicker brush features a cushioned base and flexible angled bristles that gently glide through thick coats, effectively lifting away loose undercoat and floating hairs without pulling. The curved head comfortably contours to your pet's body for stress-free fur removal and a smoother, healthier coat.\u003c\/li\u003e\r\n \u003cli\u003eGENTLE ON YOUR PET'S SKIN: Gentle Pet Slicker Brush with fine stainless steel pins and rounded tips stimulates skin circulation while removing loose hair and dander. The soothing massage distributes natural oils for a healthier, shinier coat and prevents irritation - turning regular grooming into a bonding moment your pet will love.\u003c\/li\u003e\r\n \u003cli\u003eDUAL-ACTION GROOMING \u0026amp; STYLING: Use both sides for versatile care: Smooth side for daily brushing; flip to reverse grip for blow-drying, fluffing, or styling. A must-have for achieving a salon-quality finish, whether for professional grooming or at-home maintenance.\u003c\/li\u003e\r\n \u003cli\u003eERGONOMIC, ANTI-SLIP HANDLE: Designed for effortless grooming, this dog slicker brush features a comfort-grip, curved handle that reduces hand fatigue during extended sessions. While the non-slip rubberized material ensures safety and control, ideal for large dogs or detailed grooming.\u003c\/li\u003e\r\n \u003cli\u003eEASY HAIR RELEASE \u0026amp; CLEANING: No more stuck fur! The flexible head allows effortless hair removal, and the included pet comb ensures hassle-free cleanup, keeping the brush hygienic and ready for next use.\u003c\/li\u003e\r\n \u003c\/ul\u003e","published_at":"2025-10-19T18:03:34+11:00","created_at":"2025-10-19T18:03:30+11:00","vendor":"Pecute","type":"Brushes","tags":["pets_selected_Oct2025"],"price":13700,"price_min":13700,"price_max":13700,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":44789242724552,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"B0FDQFVB29","requires_shipping":true,"taxable":true,"featured_image":null,"available":true,"name":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing)","public_title":null,"options":["Default Title"],"price":13700,"weight":180,"compare_at_price":null,"inventory_management":"shopify","barcode":"26110-15","requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0FDQFVB29.jpg?v=1775801262","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71RE0l3Y7ML.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71_WbL7QcqL.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71DoRqxTTKL.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/719MdWOYUfL.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71RiuRxegFL.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/714lPm4lfyL.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71kV9fkDBFL.jpg?v=1760857413","\/\/pawsplanetshop.com\/cdn\/shop\/files\/71-g0U1wOmL.jpg?v=1760857413"],"featured_image":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0FDQFVB29.jpg?v=1775801262","options":["Title"],"media":[{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582422728,"position":1,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0FDQFVB29.jpg?v=1775801262"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/B0FDQFVB29.jpg?v=1775801262","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582455496,"position":2,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71RE0l3Y7ML.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71RE0l3Y7ML.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582488264,"position":3,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71_WbL7QcqL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71_WbL7QcqL.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582521032,"position":4,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71DoRqxTTKL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71DoRqxTTKL.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582553800,"position":5,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/719MdWOYUfL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/719MdWOYUfL.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582586568,"position":6,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71RiuRxegFL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71RiuRxegFL.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582619336,"position":7,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/714lPm4lfyL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/714lPm4lfyL.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582652104,"position":8,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71kV9fkDBFL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71kV9fkDBFL.jpg?v=1760857413","width":1600},{"alt":"Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing) - PawsPlanet Australia","id":30296582684872,"position":9,"preview_image":{"aspect_ratio":1.0,"height":1600,"width":1600,"src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71-g0U1wOmL.jpg?v=1760857413"},"aspect_ratio":1.0,"height":1600,"media_type":"image","src":"\/\/pawsplanetshop.com\/cdn\/shop\/files\/71-g0U1wOmL.jpg?v=1760857413","width":1600}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003ch3\u003ePecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat\u003c\/h3\u003e\r\n\u003cp id=\"b\"\u003e\u003c\/p\u003e \r\n\r\n\u003ch3\u003eProduct Features\u003c\/h3\u003e\r\n \u003cul class=\"a\"\u003e\r\n \u003cli\u003eEFFORTLESS SHEDDING CONTROL: This dog slicker brush features a cushioned base and flexible angled bristles that gently glide through thick coats, effectively lifting away loose undercoat and floating hairs without pulling. The curved head comfortably contours to your pet's body for stress-free fur removal and a smoother, healthier coat.\u003c\/li\u003e\r\n \u003cli\u003eGENTLE ON YOUR PET'S SKIN: Gentle Pet Slicker Brush with fine stainless steel pins and rounded tips stimulates skin circulation while removing loose hair and dander. The soothing massage distributes natural oils for a healthier, shinier coat and prevents irritation - turning regular grooming into a bonding moment your pet will love.\u003c\/li\u003e\r\n \u003cli\u003eDUAL-ACTION GROOMING \u0026amp; STYLING: Use both sides for versatile care: Smooth side for daily brushing; flip to reverse grip for blow-drying, fluffing, or styling. A must-have for achieving a salon-quality finish, whether for professional grooming or at-home maintenance.\u003c\/li\u003e\r\n \u003cli\u003eERGONOMIC, ANTI-SLIP HANDLE: Designed for effortless grooming, this dog slicker brush features a comfort-grip, curved handle that reduces hand fatigue during extended sessions. While the non-slip rubberized material ensures safety and control, ideal for large dogs or detailed grooming.\u003c\/li\u003e\r\n \u003cli\u003eEASY HAIR RELEASE \u0026amp; CLEANING: No more stuck fur! The flexible head allows effortless hair removal, and the included pet comb ensures hassle-free cleanup, keeping the brush hygienic and ready for next use.\u003c\/li\u003e\r\n \u003c\/ul\u003e"}

Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat S Curved Head (Gentle Smoothing)

In Stock. Leaves warehouse within 2 - 3 business days

$137.00 AUD
Maximum quantity available reached.
Free Shipping Australia Wide
100% Safe & Secure Checkout
100 Days Return Policy *
1 Year Warranty *

Pecute Slicker Brush for Dogs Cats with Air-Cushion and Soft Pins, Dog Brush for Shedding Massaging Grooming, Lightweight Cat Brush with Pet Comb, Gently Removes Loose Fur Undercoat

Product Features

  • EFFORTLESS SHEDDING CONTROL: This dog slicker brush features a cushioned base and flexible angled bristles that gently glide through thick coats, effectively lifting away loose undercoat and floating hairs without pulling. The curved head comfortably contours to your pet's body for stress-free fur removal and a smoother, healthier coat.
  • GENTLE ON YOUR PET'S SKIN: Gentle Pet Slicker Brush with fine stainless steel pins and rounded tips stimulates skin circulation while removing loose hair and dander. The soothing massage distributes natural oils for a healthier, shinier coat and prevents irritation - turning regular grooming into a bonding moment your pet will love.
  • DUAL-ACTION GROOMING & STYLING: Use both sides for versatile care: Smooth side for daily brushing; flip to reverse grip for blow-drying, fluffing, or styling. A must-have for achieving a salon-quality finish, whether for professional grooming or at-home maintenance.
  • ERGONOMIC, ANTI-SLIP HANDLE: Designed for effortless grooming, this dog slicker brush features a comfort-grip, curved handle that reduces hand fatigue during extended sessions. While the non-slip rubberized material ensures safety and control, ideal for large dogs or detailed grooming.
  • EASY HAIR RELEASE & CLEANING: No more stuck fur! The flexible head allows effortless hair removal, and the included pet comb ensures hassle-free cleanup, keeping the brush hygienic and ready for next use.

Buy with confidence as this product comes with 18 months full local warranty in Australia & New Zealand (unless otherwise stated in the overview).

This product also comes with the benefits of the Warranty. For further details please read our Warranty Guidelines.

You can also purchase 3 Year Extended Care. If you are interested please see our Extended Care Information.